Sirinam – Konpetibilite ak divèsifikasyon pwojè sektè,,en,Evalyasyon anviwònman,,en,Jesyon anviwònman ak sosyal Jesyon,,en : Environmental Assessment : Environmental and Social Management Framework (English)

REZIME,,en,Objektif devlopman konpetitivite ak divèsifikasyon sektè pwojè se fasilite envestisman prive ak ranfòse chenn valè nan endistri vize nan Sirinam,,en,vii,,en,pwoblèm operasyonèl ak sekirite pou travayè yo,,en,viii,,en,degradasyon nan sit eritaj,,en,ix,,en,pèt divèsite biyolojik la,,en,Gen kèk nan mezi alèjman yo enkli,,en,enstale pawa enpèrmeabl sou oswa anba tè,,en,kontou tè ak estabilizasyon pant,,en,itilize sèlman lè li nesesè epi chanje a IPM,,en,itilize ekipman ki ba emisyon,,en,itilize ekipman ba-bri,,en,Fòmasyon OHS,,en,deplase aktivite pou fè pou evite tankou sit sansib,,en,konpanse pèt lokal pa benefis nan lòt kote,,en,Downloads,,en,SCSD,,en,ESMF,,en,pou divilgasyon,,en,ITPPF,,de,RPF,,en,RSA,,tr,SESA TOR,,sv

The development objective of Competitiveness and Sector Diversification Project is to facilitate private investment and strengthen value chains in targeted industries in Suriname. Some of the negative impacts include: (mwen) groundwater pollution; (ii) destruction of flora and fauna habitat; (iii) soil and land degradation: (iv) excessive agrochemical use; (v) air pollution; (vi) noise pollution; (vii) operational health and safety issues for workers; ak (viii) degradation of heritage sites; (ix) loss of biodiversity. Some of the mitigation measures include: (mwen) install impermeable lining on or below soil; (iii) land contouring and slope stabilization; (iv) use only when necessary and switch to IPM; (v) use low-emission equipment; (vi) use low-noise equipment; (vii) OHS training; (viii) relocate activity to avoid such sensitive site; ak (ix) compensate local loss by gain at other location.

Downloads:

SCSD – ESMF – for disclosure June 2019

SCSD – ITPPF – for disclosure June 2019

SCSD – RPF – for disclosure June 2019

SCSD – RSA – for disclosure June 2019

SCSD – SESA TOR – for disclosure June 2019